HIGH ROCK PROJECT ESTIMATOR
Build your deck estimate
Choose size, materials and upgrades to estimate your project.
Demolition & site access
Enter existing deck area. Equipment and access allowances are automatic.
Deck size & measurements
Fascia & stair risers
Enter fascia length and the combined width of stair risers. Leave at 0 for finishes you do not need.
Decking, framing & railing
New framing includes standard footing and house-connection allowances. Railing details, colors and board profiles are confirmed at quoting. Fascia mounting adds $40/LF; unavailable with horizontal cable.
Upgrades & finishing touches
OPTIONALGround prep includes topsoil removal, disposal, weed barrier and cover; major grading is extra. Drainage includes standard gutters; exclude stairs. Bench area is seat surface. Lighting bundles start at six fixtures. Handrail length includes all runs; cedar finishing is extra. Drink rail may match the deck.
